Skip to main content

US$1.3 billion Chilean road tender delayed

The tender for a US$1.3 billion Chilean road project is being delayed.
By MJ Woof June 19, 2024 Read time: 2 mins
When the Chacao Bridge is complete, it will cut journey times for travellers in comparison with the current ferry service – image courtesy of © Pablo Hidalgo| Dreamstime.com

Bidding is now being delayed until 18th July 2024 for Chile’s US$1.3 billion Route 5 Santiago-Los Vilos road project. The bidding process has been delayed by the Ministry of Public Works, which is handling the project.

The fishing port of Los Vilos lies on Chile’s Pacific Coast to the north of the country’s capital, Santiago. Improving the 224km Highway 5 linking the two will reduce journey times and boost safety along the route.

Meanwhile, construction of the new bridge connecting Chiloé Island with the Chilean mainland is delayed. The project might now take until March 2028 to be completed. Building the $1 billion Chacao Bridge will replace the current ferry service and provide an important direct link to the island, boosting its economy and providing greater scope for the development of tourism. The region does suffer major seismic events so the bridge will be a suspension type and able to cope with massive shocks. It will also be designed to cope with wind speeds as high as 240km/h as well as the fierce sea currents through the Chacao Strait.

Construction work started on the bridge in 2017 and the work was previously intended to be complete by 2019, then 2020, then 2025 and then 2026. Also known as the Chiloé Bicentennial Bridge, the 2.75km structure will be the longest suspension bridge in Latin America when complete.

In addition, a new motorway link measuring 25km will be built close to capital Santiago. Costing $539 million, the road will be constructed by a Colombian contractor, ISA Intervial, with work due to commence in 2027. The new Concesion Orbital Sur Santiago route will link Route 78, 5 Sur and Route 79 to the western side of Santiago. The contract was awarded by Chile’s Ministry of Public Works.
 

Related Content

  • Chilean highway; design unveiled
    May 17, 2019
    The design of a stretch of Chile’s Americo Vespucio Oriente (AVO) highway has been revealed.
  • Italy's Messina Strait bridge
    March 20, 2023
    The Messina Strait Bridge project in Italy is being revived.
  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C