Skip to main content

US$110.27mn deal for Daelim Industrial to build Sungai Brunei Bridge

The Brunei government has awarded a US$110.27 million (KRW 123.3bn) deal to South Korea-based Daelim Industrial (Daelim) to construct the Sungai Brunei Bridge. The Sungai Brunei Bridge will be Brunei's biggest bridge, crossing the Brunei River and connecting the regions of Kampong Sungai Kebun and Jalan to improve the economy in the south of the country. The roads that lead to the bridge will be expanded by Daelim, which will also construct two interchanges.
May 22, 2013 Read time: 1 min
The Brunei government has awarded a US$110.27 million (KRW 123.3bn) deal to South Korea-based 3088 Daelim Industrial (Daelim) to construct the Sungai Brunei Bridge.

The Sungai Brunei Bridge will be Brunei's biggest bridge, crossing the Brunei River and connecting the regions of Kampong Sungai Kebun and Jalan to improve the economy in the south of the country.

The roads that lead to the bridge will be expanded by Daelim, which will also construct two interchanges.

For more information on companies in this article

Related Content

  • Additional Romania contract for PORR
    September 16, 2021
    Austrian contractor PORR has won an additional Romanian contract, while other projects are also underway in the country.
  • Foreign investors eye expansion into Russian road-building industry
    March 18, 2016
    The Russian road sector looks set for international investment - Eugene Gerden writes Amid the ongoing recovery of the Russian economy from the effect of Western sanctions, foreign investors are considering accelerating their activities in the Russian road building industry. In recent months the establishment of joint ventures with local road building companies has become no longer as profitable for foreign investors as it was in the past. As a result the majority of foreign investors are considering
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • New Russian bridge to span Volga
    July 6, 2020
    A new Russian bridge is planned to span the River Volga.