Skip to main content

UEM Group to bid for Brunei Temburong bridge build contract

Malaysia-based UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali. The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water. Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014.
September 13, 2012 Read time: 1 min
Malaysia-based 6567 UEM Group has been invited to bid for the contract to build the 22km long Temburong bridge in Brunei, according to company chairman, Tan Sri Dr Ahmad Tajuddin Ali.

The UEM Group is already constructing the 24km long second Penang bridge, of which 16km is over water.

Dr Ahmad Tajuddin Ali said UEM Group would also aim to finish the 4,000 housing development in Kampung Mentiri by 2014. He said ministries are negotiating to add supporting infrastructure, aside from the 4,000 housing units.

For more information on companies in this article

Related Content

  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Turkey to tender for Izmir-Candarli beltway contract
    November 15, 2016
    Turkish highway authorities will tender construction of the remaining part the Izmir-Menemen-Aliaga-Candarli motorway on 15 February. The contract will be build-operate-transfer for the 76km section between the towns of Aliaga and Candarli. Constructions is expected to take three years. The 16km section between Izmir and Menemen is already finished, according to Turkish media. Up to 60,000 vehicles a day are projected to use the highway from Izmir to Candarli. It is officially called the Otoyol 30
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • India rushing to improve its highway system
    February 9, 2012
    Despite the world economic slowdown, India still seems in a rush to improve its highway system as Patrick Smith reports. Later this year India will be seen by hundreds of millions worldwide when the country's capital New Delhi hosts its biggest event ever.