Skip to main content

UAE setting construction agenda

Talks are now underway again for the US$3 billion Bahrain-Qatar Causeway project, which was delayed largely due to the financial crisis. Work on the 40km causeway project, which is intended to feature both road and rail connections, stopped in June of this year. The project is being handled by a consortium headed by Qatari Diar Real Estate Investment Company (QDREIC) and French firm Vinci Construction. Under the original plan the road links were due to be completed by 2013 and the rail connections by 2015,
May 25, 2012 Read time: 2 mins
A huge transport investment programme is expanding the Middle East's infrastructure
Talks are now underway again for the US$3 billion Bahrain-Qatar Causeway project, which was delayed largely due to the financial crisis. Work on the 40km causeway project, which is intended to feature both road and rail connections, stopped in June of this year. The project is being handled by a consortium headed by 3438 Qatari Diar Real Estate Investment Company (QDREIC) and French firm 3085 VINCI Construction. Under the original plan the road links were due to be completed by 2013 and the rail connections by 2015, However the delivery dates will form part of the discussions and it remains to be seen whether a new schedule will be required or if the original deadlines can still be met. Meanwhile the consortium 2712 Habtoor Leighton Group will commence work shortly on the $299.5 million road and infrastructure contract for Abu Dhabi's Khalifa Port & Industrial Zone (KPIZ). Habtoor Leighton comprises a contractor based in Abu Dhabi and a division of Australian firm 2474 Leighton Holdings. This is the second large contract Habtoor Leighton has been awarded for the KPIZ development project for client Abu Dhabi Ports Company (ADPC).

For more information on companies in this article

Related Content

  • Foreign investors eye expansion into Russian road-building industry
    March 18, 2016
    The Russian road sector looks set for international investment - Eugene Gerden writes Amid the ongoing recovery of the Russian economy from the effect of Western sanctions, foreign investors are considering accelerating their activities in the Russian road building industry. In recent months the establishment of joint ventures with local road building companies has become no longer as profitable for foreign investors as it was in the past. As a result the majority of foreign investors are considering
  • Hyundai E&C is working on Turkey’s new third Bosporus Bridge
    July 10, 2013
    Hyundai Engineering & Construction (Hyundai E&C) is to head a consortium building the lateral towers, aprons and suspension cables for the new Bosporus crossing in Turkey. Hyundai E&C will work in a consortium with its partner SK Engineering & Construction on the US$697 million project to construct the 2.16km Third Bosporus Bridge. This suspension bridge will feature eight lanes for motor vehicle traffic as well as two rail lines. With a width of 59m it will be the widest bridge in the world that carries a
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has