Skip to main content

Traffic Data Systems WiM for Köhlbrand Bridge

A weigh-in-motion, WiM, system from Traffic Data Systems is set for the Köhlbrand Bridge across the River Elbe in Hamburg, northern Germany.
By Adam Hill April 4, 2025 Read time: 2 mins
The reinforced concrete and prestressed concrete structure and steel cable-stayed Köhlbrand Bridge bridge was opened in 1974 (image © Robert309/Dreamstime)

Traffic Data Systems has been awarded a bridge weigh-in-motion contract from the Hamburg Port Authority  in northern Germany.

The Köhlbrand Bridge across the River Elbe is one of the most important transport links in the port of Hamburg. The reinforced concrete and prestressed concrete structure and steel cable-stayed bridge was opened in 1974. At 3.7km long, 135m high and with a clearance height 53m, the Köhlbrand Bridge is Germany's second-longest bridge.

However, 50 years of heavy traffic have taken their toll on this bridge, according to Florian Weiss, founder of Traffic Data Systems. "Today, not only significantly more - but also significantly heavier - vehicles pass the bridge than planned,” said Weiss. “That's 38,000 vehicles per day, 43% of which are heavy goods vehicles, so extensive renovation work has already been necessary several times."

The port authority put a WiM system out to tender for the first time in 2010 which was supplied by Traffic Data Systems and operated for several years. Just a few weeks after it went into operation, a ban on trucks overtaking was imposed and the maximum permitted speed was reduced from 80 kph to 60 kph.

At the end of 2024, the authority put the renewal of the WiM system out to tender and this was again won by Traffic Data Systems at the beginning of 2025.

Its WiM technology fulfills the requirements of OIML R134. In addition to overview and ANPR cameras, scanners that graphically display the profile of the vehicles will also be supplied. Installation of the WiM system is planned for this summer.

For more information on companies in this article

Related Content

  • Pocitelj Bridge reaches banks of Neretva River
    August 21, 2023
    Contractors are working to correct a concrete issue on a section of the 100m-long continuous prestressed girder bridge across the Neretva River in Bosnia and Herzegovina.
  • On track with Kistler
    February 15, 2022
    How to survey and safeguard a sensitive load-bearing road above a section of railway line? This was the challenge facing Revotec, a Vienna-based bridge monitoring specialist. The solution was KiTraffic Statistics, the weigh-in-motion (WIM) system from Kistler.
  • Weigh in motion systems aid overweight vehicle detection
    July 12, 2012
    Modern weighing equipment helps road operators tackle the costly business of road damage caused by overloaded trucks as Patrick Smith reports. Overloading of commercial vehicles has a major impact on the life expectancy of road networks. The cost of premature road failure and repairs is a major burden on many governments particularly in developing countries where this problem diverts vital funding that could otherwise be spent on health and education.
  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.