Skip to main content

THG Verk starts Ölfusá Bridge work

THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
By David Arminas December 9, 2024 Read time: 2 mins
An illustration of the new Ölfusá Bridge (image courtesy Vegagerðin/Road and Coastal Administration)

A recent sod-turning ceremony by Iceland’s minister for infrastructure, Sigurdur Ingi Johannsson, signalled the start of work for a replacement bridge over the Olfusar river.

The main contractor for the 330m-long bridge is THG Verk - in Icelandic, ÞG Verk. The cable-stayed structure across the country’s largest river will have a 60m tower and a 19m-wide deck plus a walking and cycling path, according to Vegagerðin, the national Road and Coastal Administration agency.

The bridge will reroute the ring road outside the town of Selfoss and is expected to open in the fall of 2028. The US$102.8 million project, which includes road connections, will be paid for out of tolling revenue. Vegagerðin is the legal owner of Iceland’s roads and has the authority to execute construction of infrastructures on demand from the government.

The new Olfusarbru – a replacement for an 80-year-old suspension bridge – has been designed for better seismic resistance as well as flooding by the Olfusar river.

An original cable Ölfusárbrú was first built in 1891 and became the largest bridge in Iceland at the time. But in 1944 the eastern bearing cables broke due to the weight of two trucks. The existing 84m-long suspension bridge was built in 1945 and is in the town of Selfoss. It handle around 14,500 vehicles daily, according to Icelandic media reports.

For more information on companies in this article

Related Content

  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a