Skip to main content

THG Verk starts Ölfusá Bridge work

THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
By David Arminas December 9, 2024 Read time: 2 mins
An illustration of the new Ölfusá Bridge (image courtesy Vegagerðin/Road and Coastal Administration)

A recent sod-turning ceremony by Iceland’s minister for infrastructure, Sigurdur Ingi Johannsson, signalled the start of work for a replacement bridge over the Olfusar river.

The main contractor for the 330m-long bridge is THG Verk - in Icelandic, ÞG Verk. The cable-stayed structure across the country’s largest river will have a 60m tower and a 19m-wide deck plus a walking and cycling path, according to Vegagerðin, the national Road and Coastal Administration agency.

The bridge will reroute the ring road outside the town of Selfoss and is expected to open in the fall of 2028. The US$102.8 million project, which includes road connections, will be paid for out of tolling revenue. Vegagerðin is the legal owner of Iceland’s roads and has the authority to execute construction of infrastructures on demand from the government.

The new Olfusarbru – a replacement for an 80-year-old suspension bridge – has been designed for better seismic resistance as well as flooding by the Olfusar river.

An original cable Ölfusárbrú was first built in 1891 and became the largest bridge in Iceland at the time. But in 1944 the eastern bearing cables broke due to the weight of two trucks. The existing 84m-long suspension bridge was built in 1945 and is in the town of Selfoss. It handle around 14,500 vehicles daily, according to Icelandic media reports.

For more information on companies in this article

Related Content

  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Fehmarnbelt Tunnel start looms on the horizon - 2020
    October 20, 2017
    Work on the €7 billion immersed tunnel under the Fehmarnbelt could begin in 2020, according to the Danish state planning and operating company Femern. A construction start has been delayed on the 18km tunnel that will run between Germany and Denmark because of environmental and consultation issues in Germany. But Claus Baunkjaer, chief executive of Femern, said he is confident that Germany will give approval next year with another two years of preparations. Baunkjaer noted that Denmark is all set to p
  • Braila Bridge in Romania inauguration
    June 27, 2023
    Romania’s landmark Braila Bridge link is having its official inauguration.
  • Expanding the Panamericana Oestae Highway in Panama
    November 3, 2023
    Expansion of the Panamericana Oeste highway is an infrastructure project that will help guarantee the future of Panama - Mauro Nogarin writes