Skip to main content

Test of new German road repair scheme halts traffic

Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme. The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.
July 3, 2012 Read time: 1 min
Traffic on the A 40 motorway in the German province of North-Rhine Westphalia will be stopped from using the key highway to allow for tests on a new road repair scheme.

The vehicle ban on the motorway near Essen begins on 7 July, 2012. Sources close to the scheme say that without the complete closure of the A40 motorway, the work would have taken two years to complete.

No details of what the new road repair scheme consists of have been disclosed.

Related Content

  • North Germany is planning a major road repair programme
    January 17, 2018
    In Germany North Rhine-Westphalia is planning a major programme of road repairs and maintenance works. Upgrading and widening work will also be carried out. A massive budget of €20 billion has been set for the work, which will be carried out on the key Autobahn and Bundesstrasse (highway and key trunk route) links in the area. In all, 200 projects are being planned for the state.
  • Safety barriers deliver valuable road user protection
    February 14, 2012
    Safety barriers provide an invaluable service for all road users, Mike Woof reports The safety barrier market is a key one for the highway sector, with systems providing valuable protection for all categories of road users. The importance of passive protective devices such as safety barriers can often be overlooked by the road user but is well-understood by highway designers. Redirecting an errant vehicle back into the roadway and preventing it from crossing into traffic flowing in the other direction or fr
  • UK testing electric car charging system
    August 11, 2015
    The UK is working on plans to develop contactless charging systems for electric vehicles. Trials of the technology will be carried out on test routes away from the public highway to test the systems. The technology will be able to recharge electric and hybrid vehicles. The aim of the project is to develop sound technologies that can then be installed on England’s major roads. These trials are the first of their kind and will investigate how the technology would work safely and effectively on the country’s m
  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl