Skip to main content

Terna wins Greek highway prize

Greek general construction companies Terna and AEGEK Kataskevastiki have signed a deal to develop part of the Egnatia Odos highway.The budget for the works is reported to be US$ 113.90million, plus VAT of $26,111,500. The second part of the two-part highway development project is budgeted at $23,046,800, plus VAT of $5,300,750
May 9, 2012 Read time: 1 min
Greek general construction companies 5467 Terna and 5468 AEGEK Kataskevastiki have signed a deal to develop part of the Egnatia Odos highway.

The budget for the works is reported to be US$ 113.90million, plus VAT of $26,111,500. The second part of the two-part highway development project is budgeted at $23,046,800, plus VAT of $5,300,750.

For more information on companies in this article

Related Content

  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.