Skip to main content

Terna wins Greek highway prize

Greek general construction companies Terna and AEGEK Kataskevastiki have signed a deal to develop part of the Egnatia Odos highway.The budget for the works is reported to be US$ 113.90million, plus VAT of $26,111,500. The second part of the two-part highway development project is budgeted at $23,046,800, plus VAT of $5,300,750
May 9, 2012 Read time: 1 min
Greek general construction companies 5467 Terna and 5468 AEGEK Kataskevastiki have signed a deal to develop part of the Egnatia Odos highway.

The budget for the works is reported to be US$ 113.90million, plus VAT of $26,111,500. The second part of the two-part highway development project is budgeted at $23,046,800, plus VAT of $5,300,750.

For more information on companies in this article

Related Content

  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • VINCI, Extrabit adaptive lighting in Greece
    December 28, 2023
    The system on a section of the tolled 218km-long highway - also known as Motorway 8 - adjusts the lighting to suit the driving conditions, according to highways operator VINCI Highways.
  • China’s Exim Bank to fund two new Macedonia highways
    November 15, 2013
    The Chinese Exim Bank is providing much of the funding for two highway projects in Macedonia. The construction work will be carried out by a Chinese contractor, which has signed a deal with the Macedonian Government. The Chinese Sinohydro Corporation will build two stretches of highway linking Kicevo-Ohrid and Miladinovci-Stip. These will measure 56.7km and 53km long, respectively. Some 90% of the construction costs will come from the Macedonian Government, with this €580 million being provided by the loan
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.