Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Algeria to engage Japanese government over dispute with Cojaal
    January 14, 2015
    The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
  • Moscow to invest $20 billion in massive road-building by 2015
    March 28, 2014
    A huge investment in road building will expand Moscow’s network – Eugene Gerden reports The government of Moscow plans to invest more than RUB 640 billion (US$20 billion) during the period of 2014-2015 .in a massive investment of road building in the city. This is expected to be part of Moscow city’s Master Plan, which is designed until 2025. Building of new roads is crucial for Moscow and should help the city to solve the problem of traffic jams. Despite all the efforts made by the city’s authorities in re
  • New highway investment for Moscow
    September 16, 2014
    A series of highway projects are either underway or being planned in Russian capital Moscow. Russian road authority Avtodor is inviting bids for construction and maintenance of the Central Ring Road's fifth start-up facility in the Moscow region. The road section will be 76km long and the concession package will be for 24 years. The maximum price of the contract has been set at US$1.14 billion. Is also opening bids for construction of the M11 Moscow-St Petersburg motorway's 208-258 km section. The project w
  • Rwanda to upgrade Mahama camp road
    December 19, 2022
    The successful bidder for project will be responsible for the design and construction of the road from Rusozi to the camp, as well as maintenance for three years.