Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge
  • Implementing road user charging
    February 14, 2012
    Oregon Department of Transportation's James Whitty spoke with Jason Barnes on the state's progress with VMT fee-based charging
  • COWI wins Massey Tunnel design contract
    February 18, 2022
    COWI will develop an eight-lane immersed tunnel for the George Massey Crossing Project near Vancouver, Canada.
  • ANI to auction 13 Colombian road projects in H1 2014
    September 24, 2013
    Colombia's national infrastructure agency ANI will auction 13 road projects with a combined value of more than US$7.87 billion (COP 15 trillion) in H1 2014, out of 40 planned. Nine of the scheduled auction projects have gone through the pre-qualification stage and will be definitely awarded in the first quarter of next year. In total, all 40 projects will involve investments of COP 47tn. The plan is to improve 8,000kms of roads in the country.