Skip to main content

Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway

A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl
August 1, 2013 Read time: 2 mins
A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP).

The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway.

Road capacity along the route will increase to 8,000 vehicles per hour from a current 3,000 vehicles per hour, in a push to mitigate the city increasing traffic jams.

The AVO project was originally conceived of to be the missing link in a beltway that runs around Santiago. As such, it was originally earmarked to span underground north to south for 13km, joining El Salto with the Rotonda Grecia.

However, opposition from inhabitants of the La Reina and Peñalolén districts to the last 4km-stretch of the tunnel pushed the government, which is leaving office in March 2014, to split the project and call a tender only for the first 9.3km stretch.

The responsibility for the AVO's final stretch will pass on to the new elected president. The current government led by Sebastian Piñera will leave office four months after the presidential election takes place in November 2013.

Parties interested in bidding for the first stretch have until November 22 to submit their offers.

Related Content

  • Chilean bridge project to Chiloe Island delayed
    October 31, 2018
    Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor Hyundai.
  • Overlay extends bridge's life
    July 24, 2012
    More than 3,000 vehicles a day pass over the US-95 Bridge over Lake Creek near the Coeur D'Alene Tribal Casino in Worley, Idaho, USA. The original deck, built in 2007, was poured concrete with a micro-silica layer added for protection. A QTT weather station with FreezeFree anti-icing technology is mounted in the bridge rail. With big variances in temperature and a lot of wind in this region, the original deck material became thick causing a near 80m length of micro-silica to over-harden. Idaho DOT engineers
  • Chile-Argentina tunnel project moving ahead
    June 26, 2014
    So far 18 companies have been registered as eligible for tenders in the Agua Negra Tunnel project, which will link Argentina with Chile. The tender process is commencing for the project in the second half of 2014. The new tunnel will provide a better alternative to existing routes connecting the two countries through the Andes Mountain range at present. One of the existing routes is through a high mountain pass, which is frequently blocked due to poor weather while being unsuitable for heavy vehicles. The o
  • Chile-Argentina tunnel project moving ahead
    June 26, 2014
    So far 18 companies have been registered as eligible for tenders in the Agua Negra Tunnel project, which will link Argentina with Chile. The tender process is commencing for the project in the second half of 2014. The new tunnel will provide a better alternative to existing routes connecting the two countries through the Andes Mountain range at present. One of the existing routes is through a high mountain pass, which is frequently blocked due to poor weather while being unsuitable for heavy vehicles. The o