Skip to main content

STRABAG will lead A4 highway deal in Poland

Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
May 9, 2013 Read time: 2 mins
Austrian contractor 945 Strabag is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the construction of two interchanges and access roads as well as the rehabilitation of local roads. Additional works involve the construction of 13 road overpasses, nine motorway overpasses and five bridges as well as the rehabilitation of the water, gas and electricity lines. The construction of the section between Krzyż and Dębica is the second section of the A4 being built by a Heilit+Woerner-led consortium. The company previously worked on the 21km section between Brzesko and Wierzchosławice, which was opened to traffic in November 2012.

For more information on companies in this article

Related Content

  • Polish deal done
    February 29, 2012
    The Hermann Kirchner consortium will build a 20km section of Poland's S8 express road linking Walichnowy and Zloczew.
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • STRABAG wins Norway road and tunnel contract
    May 12, 2016
    STRABAG will build a section of the European Route E16 in Norway. This route connects capital Oslo with the Norway’s second largest city, Bergen and will be the first construction project being carried out in the country with STRABAG as sole contractor. The Øye–Eidsbru section is located about midway between Oslo and Bergen. The work comprises the new construction of 4.5km of main road and 2.1km of side roads. It includes a 1.97km long tunnel that will be built using conventional drilling and blasting me