Skip to main content

STRABAG will lead A4 highway deal in Poland

Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
May 9, 2013 Read time: 2 mins
Austrian contractor 945 Strabag is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (1361 GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the construction of two interchanges and access roads as well as the rehabilitation of local roads. Additional works involve the construction of 13 road overpasses, nine motorway overpasses and five bridges as well as the rehabilitation of the water, gas and electricity lines. The construction of the section between Krzyż and Dębica is the second section of the A4 being built by a Heilit+Woerner-led consortium. The company previously worked on the 21km section between Brzesko and Wierzchosławice, which was opened to traffic in November 2012.

For more information on companies in this article

Related Content

  • Key Polish infrastructure project delivered 6 months ahead of schedule
    April 24, 2012
    Poland's most important infrastructure project of the past few years, a new 106 km section of the A2 motorway Segment II between Owiecko on the German border and Nowy Tomyol, opened this week, six months ahead of schedule.
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • Romanian roads for STRABAG
    February 28, 2012
    Austrian contractor STRABAG will build a 24km stretch of highway in Romania in a deal worth €166 million.
  • Support for Poland’s A1
    July 6, 2012
    The European Investment Bank (EIB) has in total granted a long-term facility of €1.070 billion for the construction of the second phase of the A1 motorway forming part of the priority trans-European transport network connecting the north of Poland (Gdansk) with the Austrian capital Vienna, via the Czech and Slovak Republics. The loan will finance the construction of a 62km section of the A1 motorway between Nowe Marzy and Torun on the basis of a design, build, finance and operate (DBFO) concession. This con