Skip to main content

Spanish project delays

The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway.
March 19, 2012 Read time: 1 min
The Spanish Ministry of Works requires further funds to complete work on the 261.5km A-11 Duero Highway. A further €1.13 billion is needed to pay for the work on the stretch between Los Rabanos (Soria) and San Martin del Predroso (Zamora) on the border with Portugal. There has already been €54.2 million invested in the project, which paid for construction of the 15.2km of the Aranda de Duero bypass but work is currently at a standstill. No new work has been carried out since July 2010 when the 6.2km Ronda Norte de Zamora section of the infrastructure was opened to traffic, costing some €27 million.

Related Content

  • Panama’s projected plans for infrastructure
    July 3, 2015
    Panama’s Ministry of Public Works (MOP) is spending some US$2.96 billion during its present administration on infrastructure projects. These include the construction of a fourth bridge over the Panama Canal, which will link the Albrook district and the North Corridor. There are four road widening projects planned. The link between the Las Americas bridge and Arraijan will be expanded to eight lanes and the Panamericana road between La Chorrera and San Carlos will be expanded to six lanes. The Omar Torrijos
  • $165 million for Colombian road project
    August 7, 2025
    A $165 million funding package is helping finance a key Colombian road project.
  • Hungary’s national road development boom gathers pace
    January 7, 2014
    Hungary is experiencing a road development boom. In line with the country's New Szechenyi Plan (USZT), some €3.67 billion (HUF 1.1 trillion) is to be made available for road development works. National infrastructure development company NIF says it launched road projects worth a total of €1.5 billion (HUF 450 billion) in 2013. Contracts have been signed for the full amount. Hungary's M4 motorway is to be opened in 2016 between Abony and Fegyvernek. The 29km motorway section will also include a bridge over
  • Cambodia road reconstruction projects, financing secured
    March 28, 2018
    Financing has been secured for key road reconstruction projects in Cambodia. Work is being carried out on six road projects in the country that measure a total of 600km, as well as a bridge, with this all costing some US$490 million. A loan of $94 million will help pay for the rebuilding of Cambodia’s National Road No 11 as well as a stretch of bypass. In all 96.5km of road will be rebuilt for this project, with the work intended to improve transport connections between Thbong Khmum Province and Prey Veng P