Skip to main content

Spanish highway project to get EIB A-rated bond issue?

The European Investment Bank (EIB) is reported to be in talks with the sponsors of the A-66 Benavente-Zamora highway public private partnership (PPP) in Spain over a possible bond financing deal, which would see the Bank provide subordinated debt for an A-rated bond issue. The possible bond issue would be a further greenfield project to launch the European Union’s Project Bond 2020 initiative, with its initial pilot stage being managed by the EIB.
April 20, 2012 Read time: 3 mins
The 1054 European Investment Bank (EIB) is reported to be in talks with the sponsors of the A-66 Benavente-Zamora highway public private partnership (PPP) in Spain over a possible bond financing deal, which would see the Bank provide subordinated debt for an A-rated bond issue.

The possible bond issue would be a further greenfield project to launch the 1116 European Union’s Project Bond 2020 initiative, with its initial pilot stage being managed by the EIB.
Among options reportedly being discussed is a bridge loan in the construction phase of the A-66 taken out by a bond after completion, and a short bridge facility of possibly one year taken out by a bond while still in construction.

The A11 Bruges-Westkapelle DBFM project in Belgium is at least one other PPP project the EIB is planning to use as a pilot this year. The bank has US$300million (€230million) of seed funding for the initiative, which is expected to allow it to lend around $918.4million (€700million), as reported last year. The subordinated loans can cover up to 20% of project debt.

Spain’s Ministry of Development finally awarded the A-66 project to the 930 Cintra/976 Acciona/7167 Meridiam consortium at the end of last month. It was unknown if the new government would continue with the procurement or abandon it, having previously criticised the project as too expensive. However, the winning bid came in at €998million, considerably less than the €1.33billion originally budgeted for the contract value.

Sources agreed that the A-66 project would take until around the end of the year to reach financial close, given that it had only just been allowed to proceed. The project is expected to have an upfront cost of around €220million and the EIB is considering financing up to €100million in one form or another. The road is part of the Trans-European Transport Network, making it a priority for EIB support. Both Spanish and international banks are interested in lending, a source said.

The availability-based DBFOM project, the largest PPP contract awarded by the Spanish government for over 12 months, comprises the construction of 49km of new dual carriageway from Benavente to Zamora in the region of Castilla y León, via Santovenia del Esla and Fontanillas de Castro, as well as a rest area and site for roadside commercial developments. The concession is for 30 years following signing, including 24 months for construction.

The road forms the final missing link in the A-66, known as the ‘Autovia de la Plata’ (Silver Highway) which runs north-south across the Iberian peninsula. When complete, the A-66 will cross 809km from Gijón on the Cantabrian coast to Seville in Andalucia.

For more information on companies in this article

Related Content

  • Volvo moves mountains in Portugal
    June 8, 2015
    Volvo Construction Equipment is opening up the remote Portuguese regions of Duoro and Trás-os-Montes for development through one of the largest road tunnels in the Iberian Penninsula. The Túnel do Marão project takes in Portugal’s sixth largest mountain, the Serra do Marão. At a height of 1,415m above sea level, it presents a major obstacle between the country’s second city Porto, located on the coast, and Vila Real near the Spanish border, even since the construction of the winding IP4 highway, built in t
  • Go-ahead for controversial highway
    May 30, 2012
    APPROVAL HAS now been given for work to go ahead on a key section of Slovakia’s D1 highway. The work had been delayed as the European Commission (EC) was concerned over environmental issues facing sections of the route that passed through a nature reserve. The EC has now given its approval for construction of the highway between Martin and Presov on conditional terms. The EC says that the sections in zones belonging to the Natura 2000 network can be built once terms are agreed with the Slovak government o
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u
  • New Vietnam North-South highway link planned
    April 12, 2017
    Work on the new North-South Highway in Vietnam is now underway, with preparatory work having commenced in 2016 and construction scheduled for completion in 2020. The project is being carried out under the PPP model, with initial funding being provided by a system of Government Bonds. The project is expected to cost US$2.43 billion to complete. The tender process for the design phase of the project is now opening, while a pre-feasibility study has yet to be carried out. The project is being overseen by Vietn