Skip to main content

Smart UK motorway scheme

The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth t
February 19, 2014 Read time: 2 mins
The M4/M5 project included installation of 33 new gantries, refurbishing seven existing ones, resurfacing over 22km of carriageway, laying over 48km of fibre optic cabling and constructing six emergency refuge areas
The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5.

It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth the flow of traffic. During busy periods, traffic officers in the regional control centre at Avonmouth will set overhead message signs to inform drivers they can use the hard shoulder as an extra lane and at what speed to drive.

2309 Highways Agency senior project manager Paul Unwin said: “The M4 and M5 scheme demonstrates how a smart and efficient solution can deliver improvements that road users need – more capacity and better management of traffic to reduce congestion and make journey times more reliable.”

For more information on companies in this article

Related Content

  • New concrete barrier on key M5 motorway section
    October 30, 2012
    Contractor Tarmac has carried out major works on the UK’s M5 motorway after recycling around 30,000tonnes of concrete and providing 8,000m3 of new concrete for new slip-form central barrier works. The project, between Junctions 3 and 4a of the M5, was delivered as part of an eight-week scheme to install 13km of new concrete safety barrier. Approximately 30,000 tonnes of concrete were excavated and then crushed into Type 1 and 6F5 aggregates at Tarmac’s recycling site in Ettingshall, Wolverhampton. Over 14,0
  • Mott MacDonald delivers asset monitoring solution
    June 10, 2021
    Mott MacDonald is delivering an asset monitoring solution for Highways England.
  • Staffordshire road improvements planned
    July 29, 2024
    Staffordshire road improvements will commence shortly.
  • Crash barriers aid vehicle protection, road safety
    February 8, 2012
    Barrier and crash cushion systems can make a great deal of difference to roadway safety, with new technology offering major benefits to road users. In North America and Western Europe, concrete centre line dividers are being used for many major highways as these provide a durable solution for preventing cross-over accidents with large vehicles such as heavy trucks. It is worth noting too that other countries are now adopting concrete barriers for highway centre line dividers also, with this system being use