Skip to main content

Smart UK motorway scheme

The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth t
February 19, 2014 Read time: 2 mins
The M4/M5 project included installation of 33 new gantries, refurbishing seven existing ones, resurfacing over 22km of carriageway, laying over 48km of fibre optic cabling and constructing six emergency refuge areas
The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5.

It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth the flow of traffic. During busy periods, traffic officers in the regional control centre at Avonmouth will set overhead message signs to inform drivers they can use the hard shoulder as an extra lane and at what speed to drive.

2309 Highways Agency senior project manager Paul Unwin said: “The M4 and M5 scheme demonstrates how a smart and efficient solution can deliver improvements that road users need – more capacity and better management of traffic to reduce congestion and make journey times more reliable.”

For more information on companies in this article

Related Content

  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Leaner WIM enforcement through new solutions
    December 3, 2013
    Guy Woodford reports on a major new Weigh in Motion system, big WIM solution deals and how a leading firm in the sector is warning UK fleet operators to be aware of how leaner enforcement work is helping authorities detect more overloaded vehicles Kapsch TrafficCom announced its keenly awaited new Weigh in Motion (WIM) solution at this year’s ITS European Congress in Dublin, Ireland. The sector-renowned Austrian firm’s latest solution uses a number of sensors and loops to detect whether the vehicle exceeds
  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Brisbane’s new airport link is an engineering success
    April 12, 2013
    Financial troubles for Brisbane's new Airport Link overshadow its construction success – Adrian Greeman writes. Political argument and legal dispute is likely to rage for some time yet over the bankruptcy of Australian road operator BrisConnect, which went into receivership this February with A$3 billion in debt. Toll paying users for its new Airport Link have been less than half the predicted numbers since it opened in July last summer. But if its nancial engineering is being questioned, the same is not t