Skip to main content

Slovakian project under spotlight

Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is k
July 3, 2012 Read time: 2 mins
Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The 1054 European Investment Bank (EIB) and 1166 European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the 2465 European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is keen to sign the contracts for the project, the EC is holding back until the answers are provided. The Slovakian Transport Ministry has said that it may opt to change the route of the controversial section of the Martin- Presov highway to meet requests from the European Commission. Environmental groups have suggested building tunnels but the Transport Ministry says that this would be too expensive. The latest developments mean that the highway may not be completed by 2013 as planned.

Related Content

  • EBRD sets out new loans for Coratia’s road agency, Hrvatske autoceste
    April 1, 2016
    The European Bank for Reconstruction and Development (EBRD) and Hrvatske autoceste – a state-owned company in charge of the construction, maintenance and tolling of Croatia’s motorways – have signed a loan of up to €250 million. The EBRD’s sovereign-guaranteed loan will come in two tranches. The first €200 million will be used to refinance a portion of HAC’s sovereign-guaranteed debt falling due in 2016. The remaining €50 million will finance operational and efficiency improvements and may serve as a
  • Bosnia tunnel project; work starting
    November 1, 2019
    Construction work is due to start on the Prenj Tunnel project in Bosnia. The tunnel will form part of the important Corridor 5C route. Measuring 10km in length, the road and tunnel project is expected to cost €820 million to build. Funding is being supplied jointly by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD). The Bosnian Government has also secured a portion of the necessary funding from Bosnian banks. In addition, a contract has been agreed for the
  • Bosnian highway underway
    February 24, 2012
    Construction work on a section of Bosnia's Corridor 5c highway is set to commence by the end of September 2011.
  • Tenders and financing for Serbian highways
    November 22, 2013
    The Serbian Government is considering a loan from China’s Export-Import Bank, which would pay for the construction of the E-763 highway. The bank looks set to give its approval for the €223 million loan, which would pay for 90% of the construction work for the E-763, or Obrenovac-Ljig, highway. The loan would be approved over a 20 year repayment period and a five year grace period at the fixed rate of 2.5%/year. Meanwhile tendering will open for completion works on Serbia’s Pirot-Dimitrovgrad highway unti