Skip to main content

Six years for Belgrade-Novi Sad highway

Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
By David Arminas September 17, 2024 Read time: 2 mins
Novi Sad: faster travel times to the historic city are coming (image © Xbrchx/Dreamstime)

Construction of the Belgrade-Zrenjanin-Novi Sad Highway in Serbia is expected to take around six years, according to the Serbian Minister of Construction, Transport and Infrastructure.

Goran Vesic said that the total cost of the 100km project is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group Corporation working with various Serbian contractors.

Work will include demolition of the existing Sava Bridge, according to a report by the Serbian news agency Tanjug. The 430m-long, 40-wide steel tied arch bridge, which opened in 1942, crosses the River Sava within Belgrade. It is the smallest road bridge in the Serbian capital and is used both for car and tram traffic.

Serbian prime minister Miloš Vučević, who toured the constructions site, said he believes that the work will be completed on time, noting that Shandong Hi-Speed has so far respected deadlines and quality and fulfilled what was agreed upon.

Section one of the project involves construction of 65km of highway between Ovca and Zrenjanin and then section two of 35km between Zrenjanin and Novi Sad, as well as two bridges over the Tamis River, one bridge over the Tisa River and a bridge over the Begei River.

Shandong Hi-Speed Group Corporation or Shandong Gaosu Group, is a solely state-owned enterprise in Jinan, China, owned by the Shandong Provincial People's Government. It is mainly engaged in investment, construction and operation of highways, expressways, bridges, railways, rail transits, harbours, shipping and logistics.

For more information on companies in this article

Related Content

  • Colombian infrastructure projects boost
    February 22, 2022
    Colombian infrastructure projects will be boosted with new budget.
  • Another permit for Czech Republic’s D35
    October 27, 2023
    The D35 section is part of the grade-separated junction with the D11 near Hradec Králové to Sadová.
  • Pakistan highway project awarded
    February 1, 2016
    Chinese contractors will construct two sections of Pakistan’s Peshawar-Karachi Motorway (PKM) project. This six-lane highway will be a high-speed access-controlled connection between the port city of Karachi and other major urban locations in Pakistan. China Railway 20 Bureau Group Corporation (CR20G) will carry out construction work on the 230km Lahore-Abdul Hakeem section of the highway. Meanwhile China State Construction Engineering Corporation (CSCEC) the 393km Multan-Sukkur section of the route. The PK
  • Oslo Fjord Link a priority for 2024
    October 20, 2023
    The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.