Skip to main content

Serbian road gets Chinese funding

The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway. Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate-Preljina motorway parts. The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.
November 30, 2012 Read time: 1 min
The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway.

Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate-Preljina motorway parts.

The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.

Related Content

  • New Serbia highways on track for completion
    August 12, 2015
    Serbia’s Obrenovac-Preljina highway is due to be completed by 2017. Serbia’s Ministry of Construction says that the Obrenovac-Preljina and Ljig-Preljina routes are being financed with the aid of a €274.5 million loan from China's Exim Bank, worth a total of USD 301mn (EUR 274.48mn), while the state budget secured a total of €30.1 million. Meanwhile, €300 million of funding has been secured from Azerbaijan for construction of the Ljig-Preljina route. Corridor 11, between Obrenovac and Preljina will be 105km
  • Montenegro to start work on its Bar-Serbian border motorway
    May 6, 2015
    China's Exim Bank has paid €94.30 million as the first installment for construction of the first part of the Bar-Serbian border motorway. Montenegro’s minister of finance, Radoje Zugic, said that construction is expected to begin within the next few weeks. Exim Bank has approved 85% of the total €810 million load, payable over 20 years, for construction of the first part of 49km of the motorway. Is set at 2% with a grace period of six years. Total length of the motorway will be 170km.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp