Skip to main content

Serbian bridge to go ahead

DELAYS are facing construction work on Serbia’s Corridor 10 highway project. The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished. The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule. Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese comp
July 3, 2012 Read time: 1 min
DELAYS are facing construction work on Serbia’s Corridor 10 highway project.

The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished.

The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule.

Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese company CRBC.

The 1.5km bridge, scheduled for completion in 2013, will span the Danube River and link Belgrade's municipality Zemun and the Borca area. The project also includes 21km of access roads and 85% of the project is being funded with a loan from the 3422 Chinese Exim Bank.

For more information on companies in this article

Related Content

  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Serbia highway projects moving ahead
    September 30, 2016
    Progress is being seen in Serbia with regard to some of the country’s key highway projects. The Ljig-Preljina stretch of the Corridor 11 highway will open for traffic at the end of October 2016. The highway route will be tolled but these will not be implemented until the start of 2017. Plans are also moving ahead for the ring road project for the capital, Belgrade. Meanwhile talks are being held with the European Investment Bank (EIB) over the new highway link to run from Nis, through Merdare and over the b
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.