Skip to main content

Serbia project for Chinese?

Serbian Minister of Construction and Urbanism, Velimir Ilic, claims the China Roads and Bridges Company (CRBC) has verbally agreed to invest €2.5 billion (US$ 4.8bn) to enable the construction of the Corridor 11 motorway. Ilic said that an official CRBC offer to fund and build the key motorway route will be submitted from the beginning of September 2012. The CRBC is already participating in construction of Serbia’s Zemun-Bora bridge. Ilic added that the World Bank (WB) had expressed interest in funding a
December 11, 2012 Read time: 1 min
Serbian Minister of Construction and Urbanism, Velimir Ilic, claims the 3366 China Road and Bridge Corporation (CRBC) has verbally agreed to invest €2.5 billion (US$ 4.8bn) to enable the construction of the Corridor 11 motorway.

Ilic said that an official CRBC offer to fund and build the key motorway route will be submitted from the beginning of September 2012. The CRBC is already participating in construction of Serbia’s Zemun-Bora bridge. Ilic added that the 2332 World Bank (WB) had expressed interest in funding a new energy efficiency project, which could create 100,000 jobs in the construction sector.

For more information on companies in this article

Related Content

  • Serbia seals the deal for start of Belgrade Corridor 11 ring-road
    July 21, 2016
    Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
  • Eastern European highway and tunnel projects
    May 15, 2012
    Serbia’s Corridor 10 project, seen as key to the country’s future economic development, is 20 years behind schedule. With construction delayed and the matter being debated, the Serbian Ministry for Infrastructure, which reported the schedule delay, says the country is working as fast as possible, with 22km being built/year. The corridor will connect the country with its neighbours and provide an important route for through traffic.
  • Serbia speeding spending on roads
    May 21, 2014
    Serbia is planning to speed construction of its highway network. A key project being prioritised is the Corridor 10 motorway, which is due for completion by September 2016. Another priority project is for Corridor 11 and for several regional road routes. At present the Corridor 10 sections between Sid and Belgrade, and Subotica and Belgrade have been built, while work on the 22km Ipsilon stretch between Subotica and Kelebija is underway. Work is also underway on the 96km south node from Grabovnica to Presev
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp