Skip to main content

Romanian road development continues

The Romanian road authorities are trying hard to get the country's network improvement plans back on track.
February 28, 2012 Read time: 1 min
The Romanian road authorities are trying hard to get the country's network improvement plans back on track. The National Roads and Highways Company (2870 CNADNR) has recently signed a further five new contracts for the construction of highway segments. These will form part of the Pan-European Corridor IV and the total value of the deals is close to €693 million, including VAT. A consortium formed by Spedition UMB-Tehnostrade-Carena Impresa di Costruzioni was awarded a contract worth nearly €64 million to build a 10km segment of the Timisoara-Lugoj highway. Romstrade-2753 Monte Adriano Engenharia e Construcao-Donep Construct consortium won a contract worth €116 million to build a segment of the Nadlac-Arad highway. Another segment of this highway measuring 16.6km will be built by Austrian contractor Alpine Bau for €124.5 million. A consortium formed by Tirrena Scavi-Societa Italiana per Condotte d'Acqua-Cossi Construzioni will build the first segment of the Lugoj-Deva highway for €206 million. And Italian firm 3149 Impregilo was awarded a contract worth €183 million contract to build a segment of the Orastie-Sibiu highway.

For more information on companies in this article

Related Content

  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.
  • Czech Republic highway deal for consortium
    October 8, 2020
    A highway deal in the Czech Republic will be handled by a consortium.
  • Date set to complete D1 Višňové Tunnel section
    July 20, 2023
    The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.
  • Poland’s GDDKiA promises to improve road procurement processes
    January 12, 2015
    The Polish national roads authority GDDKiA has said that it will no longer look for the cheapest offer in road-building tenders. Instead, it will, in line with European Union requirements, consider whole life cycle factors such as durability, cost of exploitation and quality. Poland has long been criticised by the road construction industry, both within the country and in the rest of Europe, for handing out tender wins to the lowest bidder with scant regard for life-cycle costs. The government has also b