Skip to main content

Romanian road development continues

The Romanian road authorities are trying hard to get the country's network improvement plans back on track.
February 28, 2012 Read time: 1 min
The Romanian road authorities are trying hard to get the country's network improvement plans back on track. The National Roads and Highways Company (2870 CNADNR) has recently signed a further five new contracts for the construction of highway segments. These will form part of the Pan-European Corridor IV and the total value of the deals is close to €693 million, including VAT. A consortium formed by Spedition UMB-Tehnostrade-Carena Impresa di Costruzioni was awarded a contract worth nearly €64 million to build a 10km segment of the Timisoara-Lugoj highway. Romstrade-2753 Monte Adriano Engenharia e Construcao-Donep Construct consortium won a contract worth €116 million to build a segment of the Nadlac-Arad highway. Another segment of this highway measuring 16.6km will be built by Austrian contractor Alpine Bau for €124.5 million. A consortium formed by Tirrena Scavi-Societa Italiana per Condotte d'Acqua-Cossi Construzioni will build the first segment of the Lugoj-Deva highway for €206 million. And Italian firm 3149 Impregilo was awarded a contract worth €183 million contract to build a segment of the Orastie-Sibiu highway.

For more information on companies in this article

Related Content

  • A rough ride for Denmark’s National Road Directorate
    November 1, 2019
    Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Colombian highway projects under development
    June 29, 2018
    A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
  • Delays to highway, tunnel and bridge building
    May 14, 2012
    The Slovakian government is being asked for financial compensation by Granvia, the group building the country’s new Nitra-Banska Bystrica highway. Granvia is building the highway under the PPP model through a 30-year concession deal. The compensation has been requested due to delays that have been caused by the need for archaeological investigations along the route.