Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
  • Work starts on last Sofia-Kalotina section
    May 24, 2023
    Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.
  • Tenders placed for Polish expressway project
    July 22, 2014
    Bidding has been strong for an expressway project in Poland. The S7 route will connect Olsztynek and Milomyn with the Ostroda ring road. The project is expected to cost in the region of €350.64 million to construct in all. Seven bidders competed for the project with a consortium comprising contractors Intercor, Erbedim and Pozbud making the highest offer at €416.42 million. The lowest offer meanwhile came from another construction consortium comprising the companies Salini, Todini and Impregilo with a bid o
  • Green light for S6 dual carriageway section in Zachodniopomorskie
    December 14, 2016
    Poland’s Zachodniopomorskie province has given the go-ahead to the consortium set up by Dragados and Polaqua to start construction of a section of the S6. A deal was done in October 2015 for work on the 24km section of the dual carriageway between Kielpino and Kolobrzeg. The cost is estimated to be nearly €105 million. Meanwhile, a section of the S19 express road - between Slawinek junction and the northern part of the Lublin city ring road – was opened this month. Budimex built the 10km stretch in so