Skip to main content

Romania set to start Sebes-Turda motorwa construction

Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges. Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania. Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the European Union as grants and the central gover
November 7, 2014 Read time: 2 mins
Construction of the proposed Sebes-Turda motorway will start by the end of November, according to Eugen Cecan, director of Romania’s Regional Administration for Roads and Bridges.

Cecan made the announcement in Cluj, the second most populous city in Romania after the capital Bucharest and considered the unofficial capital to the historic province of Transylvania.

Cost of the 70km project is around US$500.34 million (€400 million), with 85% coming from the 1116 European Union as grants and the central government investing the remaining 15%.

Cecan said the motorway will be completed by March 2016 and run north from Sebes, with a population of around 25,000, to Turda with a population of 45,000.

Sebes is at the crossroads of two main highways in Romania: E68 European route - DN1 coming from Sibiu and going towards Deva and E81 European route - DN7 coming from Sibiu and going towards Alba-Iulia and Cluj.

Construction work on the motorway is split into four contracts, awarded last year.

Lot 1 – 17km from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului – was awarded to the Italian consortium 7809 Salini Impregilo at a cost of nearly $151 million (539,488,704 lei).

Lot 2, around 24km from Paraul Iovului to Aiud, was awarded to an Italian-Romanian consortium that includes RCM Costruzioni, Shelter Construct and Eurocerad International for nearly $128.5 million (460,019,270 lei).

The 12.5km Lot 3 section from Aiud to the Decea interchange is being built by the consortium of Tirrena Scavi and Societa Italiana per Condotte d'Acqua at a cost of cost of $117.5 million (420,511,921 lei).

Lot 4, around 16km from the Decea interchange to the interchange with the A3 motorway near Turda, was awarded to the Romanian division of 3976 Porr Group, Porr Construct SRL, German division Porr Bau, for a cost of $131.4 million (470,004,894 lei).

For more information on companies in this article

Related Content

  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • AVTODOR seeks another Moscow-St Petersburg motorway section bid
    December 18, 2014
    Russia's state highways agency AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway. Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section. Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure. In February 2014
  • A new report highlights China’s future economic growth
    November 15, 2012
    A new report from consultancy firm Frost & Sullivan says that China will benefit from unparalleled urban growth. According to the report, China will become the world’s leading economy by 2025, surpassing that of the US. Urban growth and infrastructure investment will see China having 13 mega-cities, four mega-regions and six mega-corridors by 2025. This growth will be fuelled by strong urbanisation, a favourable corporate environment, huge infrastructure investment and the largest working age population. Th
  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate