Skip to main content

Road tender process opening in Israel

The Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion.
April 24, 2012 Read time: 2 mins
The 2602 Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion. This will allow the road to boost capacity and cope with the steadily increasing traffic volumes and help cut congestion on the route. Meanwhile the upgraded link will allow speeds of up to 100km/h between Ashdod interchange and Holot interchange. The newly widened route is expected to be open to traffic within 18 months. This tender is one of a series of actions implemented by 2572 Israel's Ministry of Transport with the goal of improving access to Ashdod Port. The 16km long road section that will be upgraded currently suffers from heavy traffic congestion. The new project will remove a bottleneck on one of the most congested links between Ashdod and Rishon LeZion, and the traffic in the direction of Tel Aviv. As part of the project, the bridges along the route will also be renovated. In order to shorten the time needed to carry out the project, the tenders were published based on the Price and Time (A+B) method. According to this method, the winning contractor is the bidder who offers the lowest price combined with the shortest execution time. The project is estimated to cost some US$78.7 million and is expected to be completed in less than a year.

For more information on companies in this article

Related Content

  • Key route upgrades for Scotland
    July 19, 2012
    Major road projects in Scotland will improve the country’s transport connections. Plans are now in hand to fast-track the project to convert the A9 to dual carriageway status along its entire length. The road is a major transport artery to the north of Scotland, connecting the Central Belt in the south with the northern city of Inverness, providing the main gateway to the north of the country. The plans call for the upgrading of the A9 to dual carriageway status between Perth and Inverness. Work on the 5km
  • Analysing green Australian procurement practices
    December 16, 2014
    Adriana Sanchez and Keith Hampson of the Sustainable Built Environment National Research Centre (SBEnrc) discuss green procurement Procurement has a key role impacting the lifecycle of a construction project and can serve to drive many sustainability outcomes. Green procurement in particular can be used as a strategic tool to promote certain behaviour and as an environmental policy instrument to translate environmental policies into environmentally sustainable project processes, products and services. Th
  • Major road deals for France
    May 3, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.
  • Major road deals for France
    March 20, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.