Skip to main content

Road tender process opening in Israel

The Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion.
April 24, 2012 Read time: 2 mins
The 2602 Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion. This will allow the road to boost capacity and cope with the steadily increasing traffic volumes and help cut congestion on the route. Meanwhile the upgraded link will allow speeds of up to 100km/h between Ashdod interchange and Holot interchange. The newly widened route is expected to be open to traffic within 18 months. This tender is one of a series of actions implemented by 2572 Israel's Ministry of Transport with the goal of improving access to Ashdod Port. The 16km long road section that will be upgraded currently suffers from heavy traffic congestion. The new project will remove a bottleneck on one of the most congested links between Ashdod and Rishon LeZion, and the traffic in the direction of Tel Aviv. As part of the project, the bridges along the route will also be renovated. In order to shorten the time needed to carry out the project, the tenders were published based on the Price and Time (A+B) method. According to this method, the winning contractor is the bidder who offers the lowest price combined with the shortest execution time. The project is estimated to cost some US$78.7 million and is expected to be completed in less than a year.

For more information on companies in this article

Related Content

  • Vietnam plans new ring road for Hanoi
    February 23, 2012
    The Vietnamese Government is moving forward with its project to build ring road No 4 around Hanoi.
  • Russia ploughs ahead with road expansion
    October 14, 2022
    Despite Western economic sanctions, Russia plans a record road building programme up to 2027, as Eugene Gerden reports
  • Illuminated road studs deliver tidal flow safety
    February 14, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
  • Illuminated road studs deliver tidal flow safety
    May 2, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.