Skip to main content

Road tender process opening in Israel

The Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion.
April 24, 2012 Read time: 2 mins
The 2602 Israel National Roads Company has published the tender documents for the upgrading of road No 4 between Ashdod port and the Greater Tel Aviv region. The project involved widening the road by adding a third lane in both directions between Ashdod and Rishon LeZion. This will allow the road to boost capacity and cope with the steadily increasing traffic volumes and help cut congestion on the route. Meanwhile the upgraded link will allow speeds of up to 100km/h between Ashdod interchange and Holot interchange. The newly widened route is expected to be open to traffic within 18 months. This tender is one of a series of actions implemented by 2572 Israel's Ministry of Transport with the goal of improving access to Ashdod Port. The 16km long road section that will be upgraded currently suffers from heavy traffic congestion. The new project will remove a bottleneck on one of the most congested links between Ashdod and Rishon LeZion, and the traffic in the direction of Tel Aviv. As part of the project, the bridges along the route will also be renovated. In order to shorten the time needed to carry out the project, the tenders were published based on the Price and Time (A+B) method. According to this method, the winning contractor is the bidder who offers the lowest price combined with the shortest execution time. The project is estimated to cost some US$78.7 million and is expected to be completed in less than a year.

For more information on companies in this article

Related Content

  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • EU funding tunnel safety investment for Maastricht
    January 21, 2013
    The new urban tunnel project under construction at Maastricht in the Netherlands will benefit from EU for key safety features. The European Union will provide co-financing of €5 million from the TEN-T Programme to install safety provisions for the on-going implementation of Maastricht’s E25/A2 urban highway tunnel. The work will help ensure the link features high standards of tunnel safety and security and meets the EU’s tough legislation. The project was selected for funding under the 2011 TEN-T Annual Cal
  • Ecuador’s president Correa announces Strategic Mobility Plan
    November 15, 2016
    President of Ecuador, Rafael Correa, announced that the national government will implement the Strategic Mobility Plan until 2030, which will require public and private investments of USD 38bn (EUR 33.83bn). The Minister of Transport and Public Works, Boris Cordova, further added that the primary objective of the initiative will be to expand some of the national routes and to convert them into motorways, in order to accommodate the mounting logistical needs of the growing national economy. With the projects
  • Kenyan capital’s key connection construction contract cost climbs
    February 27, 2018
    The project to build the new highway link from Kenya’s capital Nairobi to the city’s Jomo Kenyatta International Airport (JKIA) is now expected to cost US$579 million. This represents an increase of around $206 million from the pricetag originally expected for the link. This cost increase comes despite a substantial change in the design, with the route now featuring a series of flyover sections and underpasses, instead of being elevated along its 43.5km length as originally proposed. This redesign will