Skip to main content

Road repairs will revamp the ring road around St Petersburg

Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.
April 19, 2012 Read time: 1 min
Repair work is now planned on the first section of the St Petersburg ring road. The work will be carried out from Gorskaya to Primorskoe in 2013. Design work is underway at present. The 24km road will be widened to six lanes and the road structure will be revamped. The repair will end in 2015 and will cost some US$373 million. Work on the interchange in Bronka will commence in 2013 as well.

Related Content

  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • German highway contract for STRABAG
    August 10, 2021
    A major German highway contract will be worked on by STRABAG.
  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.