Skip to main content

Qatar’s Lusail tunnel project

Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel. The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tourname
March 24, 2017 Read time: 2 mins
Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system

The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. 2314 Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel.

The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development will generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

The construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to a high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was keen for waterproofing technologies to set new standards.

James Hopper, regional sales manager – Middle East, Stirling Lloyd, said, “Faced with challenging ground conditions and a fast track construction programme, the ease, speed and effectiveness of the Integritank fully bonded, seamless waterproofing system was integral to the project.”

For more information on companies in this article

Related Content

  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
  • Flexible resin speeds asphalt surface repair
    March 15, 2012
    Stirling Lloyd is using innovative micro-trenching technology during a £1.1million (US$1.72million) project to improve Internet infrastructure on the Shetland Isles off the north-east Scottish coast.
  • Flexible resin speeds asphalt surface repair
    April 4, 2012
    Stirling Lloyd is using innovative micro-trenching technology during a £1.1million (US$1.72million) project to improve Internet infrastructure on the Shetland Isles off the north-east Scottish coast. Fibre optic cables were fitted in a micro-trench 20mm wide and 150mm deep following road excavation, before the company’s Safetrack Crack Infill (SCI) system was used to reinstate the road surface for less closure delays.