Skip to main content

Qatar’s Lusail tunnel project

Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel. The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tourname
March 24, 2017 Read time: 2 mins
Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system

The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. 2314 Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel.

The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development will generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

The construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to a high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was keen for waterproofing technologies to set new standards.

James Hopper, regional sales manager – Middle East, Stirling Lloyd, said, “Faced with challenging ground conditions and a fast track construction programme, the ease, speed and effectiveness of the Integritank fully bonded, seamless waterproofing system was integral to the project.”

For more information on companies in this article

Related Content

  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • The Fehmarnbelt Tunnel, another Danish connection
    June 20, 2017
    The Fehmarnbelt Tunnel between Denmark and Germany is both ambitious and innovative, explains Susanne Kalmar Pedersen, project director at design engineering firm Ramboll, adviser to the client Fehmarn A/S. The ambitious Fehmarnbelt Tunnel - one of Europe’s largest ongoing infrastructure projects - is a priority project within the EU’s Trans European Network (TEN-T) programme. It will link the German island of Fehmarn with the Danish island of Lolland. The tunnel is an 18km immersed combined road and rail l
  • Doka wins Fehmarnbelt Tunnel formwork deal
    November 17, 2022
    When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.
  • Intermat’s Middle Eastern opportunity
    January 6, 2017
    More than 200 companies are preparing to take part in INTERMAT Middle East being held at the Abu Dhabi National Exhibition Centre from October 8-10 2012. Guy Woodford spoke to the ambassador of the UAE to France and senior figures in three exhibiting companies about the significance of the event and what they are looking to achieve through it.