Skip to main content

Qatar’s Lusail tunnel project

Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel. The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tourname
March 24, 2017 Read time: 2 mins
Qatar’s Lusail Tunnel is forming part of a new US$30 billion integrated transportation system

The tunnel, and troughs to be constructed from Spring 2017, will carry both road traffic and light rail. 2314 Stirling Lloyd’s Integrating system has been used to waterproof 77,416m2 of the new tunnel.

The cut and cover tunnel will open in Spring 2017 and will ensure easy access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development will generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

The construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to a high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was keen for waterproofing technologies to set new standards.

James Hopper, regional sales manager – Middle East, Stirling Lloyd, said, “Faced with challenging ground conditions and a fast track construction programme, the ease, speed and effectiveness of the Integritank fully bonded, seamless waterproofing system was integral to the project.”

For more information on companies in this article

Related Content

  • Intermat’s Middle Eastern opportunity
    April 17, 2012
    More than 200 companies are preparing to take part in INTERMAT Middle East being held at the Abu Dhabi National Exhibition Centre from October 8-10 2012. Guy Woodford spoke to the ambassador of the UAE to France and senior figures in three exhibiting companies about the significance of the event and what they are looking to achieve through it.
  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.