Skip to main content

£495 million National Highways specialist contract

A £495 million National Highways specialist engineering advice contract has been awarded.
By MJ Woof July 1, 2025 Read time: 2 mins
M42: A new stretch of dual carriageway in the UK is now open and will cut journey times for drivers


A £495 million contract has been awarded by National Highways to AtkinsRéalis Jacobs Joint Venture, Ove Arup & Partners, Amey, Arcadis, Costain, and WSP in collaboration with Mott MacDonald. This for a new Specialist Professional and Technical Services Framework (SPaTS3) contract. The firms will have been selected by National Highways for the SPaTS3, technical engineering advice framework.

This advisory and engineering role is intended to help the highways network drive economic growth, improve safety and reliability, and further the UK’s decarbonisation goals. This builds on the foundations laid under the SPaTS2 framework, which Costain was previously selected for. The SPaTS3 Framework has an estimated maximum value of up to £495 million to the six suppliers over its six-year term and will cover the whole of Roads Investment Strategy 3. 

The services under the framework will encompass geotechnical engineering, asset operation, maintenance, assurance, performance, design standards manuals and departures, environmental, highways structures, sustainability, and transport engineering services.

The previous framework, SPaTS2, facilitated specialist advice and support through the Second Road Investment Strategy.

Meanwhile, a new stretch of dual carriageway in the UK will improve journey times for drivers. The A4545 dual carriageway links the newly built junction 5a on the M42 with Clock Interchange roundabout – providing people with direct access from the M42 to Birmingham Business Park, Birmingham Airport and the A45 to Birmingham, whilst also acting as an alternative route into the National Exhibition Centre.

The 2.4km stretch initially opened with one lane running in both directions at the end of last year but now permanent traffic management has been removed, and the road is fully up and running helping to relieve traffic congestion at junction 6 and poor journey reliability in the area.

With work due to complete on the M42 Junction 6 scheme this winter, National Highways has revealed that by combining works along the corridor it has been able to avoid 8,892 hours of closures, saving the taxpayer over £650,000 and preventing 1,072tonnes of carbon emissions.

So far, HS2 works, utility company work and National Highways maintenance and survey schemes have been completed during the M42 closures and project teams working in the area continue to identify opportunities to reduce disruption and save money.

For more information on companies in this article

Related Content

  • Specialist asphalt supply for road upgrade
    November 10, 2021
    A major road in Norfolk has been improved following the installation of Tarmac’s largest ever supply of a specialist asphalt solution. This material grade has been designed to maintain roads where the underlying concrete has deteriorated
  • Mott MacDonald picks up Highways England’s operations centre deal
    March 28, 2018
    Mott MacDonald will set up an asset management system as part of Highways England’s new technology operations centre. Under the T-TOC contract - Tools for the Technology Operations Centre – Mott MacDonald will work with Fujitsu which will develop a suite of software systems to monitor and manage electronic assets across Highways England’s network. Highways England has nearly 100,000 intelligent infrastructure devices across England’s strategic road network – trunk roads and motorways. T-TOC will enable a
  • $57 million South African road repair works
    August 1, 2025
    A $57 million road repair project is underway for a key route in South Africa.
  • Mott MacDonald’s passage to India
    April 24, 2012
    Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T