Skip to main content

Progress on Balkan motorway

The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.
April 24, 2012 Read time: 1 min
The Bosnia and Herzegovina Government says 60% of works have been completed on the Corridor V-c motorway between Drivusa and Kakanj. The €43.20million (US$56.28million) project, agreed in April 2010 between the Government's roads directorate and joint venture firm Viadukt d.d-Hering, will see the motorway created from three sub-roads between Drivusa-Gorica, Gorica-Biljesevo and Biljesevo-Kakanj.

Related Content

  • UK widening contract awarded to
    September 21, 2015
    A joint venture formed of Balfour Beatty and Carillion has won the tender process for a €401 million (£292 million) road widening package in the UK. The joint venture will commence with preparatory works worth €686,680 (£500,000) initially as the main contract is subject to approval of the wider A14 improvement scheme. The aim of the joint venture’s work is to upgrade the A14 between Swavesey and Milton. This forms part of the wider A14 Cambridge to Huntingdon road improvement scheme. The joint venture is a
  • Boost for Romania’s road spending
    December 19, 2022
    A big boost for is being seen for Romania’s road spending.
  • CECE Summit 2020: a shift in mindset needed
    January 29, 2020
    Digitalisation and sustainability focused minds at the recent biennial CECE Summit in Brussels
  • Bolivian Government to invest US$129.3mn in Moxos-Trinidad road
    October 31, 2013
    A project to improve Bolivia’s existing 77.8km road between San Ignacio de Moxos and Trinidad will cost US$129.3 million, the government has announced. The project includes a 1.7km bridge over Mamore river. The first areas of work will involve the road between San Ignacio de Moxos and Puerto Ganadero. This section will cost US$84 million and will be improved by ABC. Euroestudios-CPS Belmonte has signed a US$2.2 million contract with ABC for studies on the future Mamore river bridge. The cost of the bridge h