Skip to main content

Probolinggo-Banyuwangi section opens

Main construction of the 11.2km-long section on Indonesia’s island of Java has been completed with road markings, signs and street lighting, along with the toll gate at Paiton.
By David Arminas April 3, 2025 Read time: 2 mins
The Probolinggo–Banyuwangi Toll Road in East Java is the final phase of Trans-Java Toll Road with the port of Merak on the western end (image © Tarasari/Dreamstime)

The Kraksaan-Paiton section of the Probolinggo-Banyuwangi Highway on the island of Java is now open but with limited travel, according to Indonesian media reports.

Main construction of the 11.2km-long section has been completed with road markings, signs, barriers, guardrails and public street lighting, along with the toll gate at the town of Paiton.

The highway has been operating as a one-way system during the Eid holiday period, the end of the holy month of Ramadan, with traffic flowing from Kraksaan to Paiton for some time and then from Paiton to Kraksaan.

The four-lane road has a 100kph speed limit and will connect to the 13km Gending-Kraksaan toll road section. This national strategic project is managed by PT JPB, with majority ownership by PT Jasa Marga (Persero) Tbk at 96.33%. It is being constructed by a consortium of HKI, PT Acset Indonusa Tbk. (ACST) and PT Nindya Karya (NK).

The Probolinggo–Banyuwangi Toll Road in East Java will run from the Probolinggo Regency (region) eastward through the Situbondo Regency and end in the Banyuwangi Regency. The toll road will be integrated with Banyuwangi’ port of Ketapang to allow crossing from the island of Java to Bali. The toll road is the final phase of Trans-Java Toll Road with the port of Merak on the western end.

Related Content

  • Opening set for Bikos Tunnel section of R4
    June 5, 2023
    Opening of the first stage of Slovakia’s R4 Presov-Northern Bypass expressway, including the 1.1km-long twin-tube Bikos Tunnel, is set for this summer.
  • Funding secured for Indonesian road projects
    January 13, 2022
    Funding is being secured for key Indonesian road projects.
  • Sao Paulo’s Mario Covas ring road faces last section glitch
    April 10, 2015
    A consortium of Brazil's Mendes Junior and Spain's Isolux Corsán could lose its US$208 million contract to build part of the northern section of the Mario Covas beltway around the Brazilian city of São Paulo. The consortium, led by Mendes Junior, is falling behind schedule because of cash flow problems, according to São Paulo state highway company Dersa. The deal was signed in January 2013, local paper Folha de São Paulo reported.
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de