Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Peruvian highway has highest tunnel
    October 2, 2014
    A new tunnel connection is helping boost connectivity in Peru, improving access to remote areas Building the tunnel has been an important project as Peru has an imbalance in population distribution with 54.6% of its inhabitants concentrated in the areas along the Pacific Ocean, while only 32% of the population lives in the Andes highlands and 13.4% in the Amazon tropical jungles. The imbalance is acute given that the tropical jungle areas account for 60% of the country’s national territory. Economic deve
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Finley’s triple bridge design-build success in Israel
    April 9, 2013
    Finley Engineering Group (Finley) is providing segmental bridge design and construction engineering services on three design-build projects in Israel. Road 722 is a US$68.9 million project in Haifa awarded to Danya-Cebus. The project’s twin precast segmental bridges have a total length of 314m and six spans. The Road 722 Bridge is said to be based on the same cross section and erection method that Finley developed for Danya-Cebus and used on the Road 431 project (5 bridges), the Section 18 Interchange (6 br
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost