Skip to main content

Prequalification tender for Oman carriageway project floated

The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
June 13, 2013 Read time: 2 mins
The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate.

Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length of 2.2km. The construction costs are predicted to reach about US$1 billion.

The closing date for prequalification bids is on 11 July 2013. Among the companies that are keen on the projects are reported to be 3086 Daewoo Engineering and Construction of South Korea, Yuksal Construction, 2709 STFA of Turkey, CCC, 2379 Ghantoot Transport of the UAE, NUEC, 3340 Makyol of Turkey, GKC Projects of India, Leighton Middle East, SEW Infra of India, GS Engineering of South Korea, Kayson of Iran, 945 Strabag Oman, 4921 TOTO, 5739 Hyundai Engineering & Construction of South Korea, 5544 Sinohydro of China, Galfar, IsoluxCorsan of Spain, 4148 Mapa GUNA, 980 OHL Construction of Spain, Hanjin Heavy Industries of South Korea, Sambu Construction of South Korea, Oman Shapoorji, Orascon, 3149 Impregilo of Italy, Ozkar Construction of Turkey, 5177 Vinci of France, Wade Adams of the UAE, 4138 Bechtel, Impresa of Italy and Cyfield

For more information on companies in this article

Related Content

  • Brazilian state of São Paulo announces bids for ring road
    May 28, 2012
    The Governor of São Paulo, Geraldo Alckim, has confirmed that the regional road development agency Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road. Of the bids, 17 are organised in consortia. Companies from Spain, Italy, France, Portugal, Mexico, Argentina and Korea are among those seeking the ring road tender. The reference price of the major infrastructure project is estimated at US$ 3.11billion, and the International
  • Strabag wins Poland S7 dual carriageway tender
    June 17, 2014
    Strabag consortium has won a tender for the construction of a 4.5km S7 dual carriageway section in the eastern part of Krakow, Poland. The investment will also include the construction of a bridge over the Vistula River. The gross value of the offer made by Strabag reached almost €127.93 million (PLN 529 million), which is less than the budget of the investor set at PLN 610.3 million. In total nine offers have been submitted in the tender. All bidders offered a ten-year guarantee and a 27-month deadline.
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • 100th Warrior 2400 mobile screen delivered to Oman
    December 3, 2013
    Powerscreen has delivered its 100th Warrior 2400 mobile screen to its Oman distributor General Engineering Services (Genserv). One of Oman’s leading infrastructure companies, Galfar Engineering SAOG, originally requested a scalping plant from Genserv. Galfar required machines capable of providing output capacities ranging from 700-900tonnes/hour and, more importantly, that were mobile as they planned to use them for roads and building projects across Oman. Genserv recommended the Warrior 2400 scalping s