Skip to main content

Polish road in tender trouble

A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDD
December 17, 2012 Read time: 1 min
A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of 3206 Hydrobudowa, 6461 SIAC Construction, 5279 PBG, and 6462 Aprivia. GDDKiA is reported to have sought a fresh tender due to perceived delays in work on the Debica-Tarnow section. SIAC is said to be prepared to complete the investment, provided GDDKiA pays it €165.33 million (PLN 675mn). Earmarked to stretch 670km from the Polish-German border in Zgorzelec, through Wroclaw, Katowice, Kraków, Tarnów, and Rzeszów, to the Polish-Ukrainian border at Korczowa, the A4 is due for completion in 2013.

Related Content

  • Czech road project awards and tender
    July 19, 2024
    Czech road projects have been awarded, with another due to open for tender.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land
  • Polish projects awarded
    February 3, 2021
    A series of Polish road projects have been awarded.