Skip to main content

Poland’s viaTOLL system expanded

The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.
January 21, 2013 Read time: 1 min
The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.

Related Content

  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • Poland pushes ahead with major new roads programme
    September 11, 2015
    The Polish government will spend around US$28.3 billion over the next eight years in one on the country’s largest new-road investment programmes. Nearly 4,000km of motorways and dual carriageways will be constructed as well as 50 ring roads around urban centres. More than 1,000 sections of roads deemed dangerous will be rebuilt, according to a report in the Polish newspaper Gazeta Prawna. The announcement comes after the Poland’s road and motorways authority GDDKiA said in June that it plans to awa
  • Trakcja and Mostostal Warszawa pick up S61 deal in Poland
    July 25, 2018
    A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans