Skip to main content

Poland’s viaTOLL system expanded

The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.
January 21, 2013 Read time: 1 min
The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.

Related Content

  • Poland's highway plans to go ahead
    May 15, 2012
    In Poland, the European Investment Bank has committed itself to maintaining its loan agreement for the A1 highway, despite recent problems over the project. The e1.1 billion loan that the EIB had agreed with Autostrada Poludnie for construction of a 180km section of the A1 highway from Strykow to Pyrzowice, will now be placed at the disposal of the Polish highway authorities. To carry out the work, Poland has to raise a further e503 million, which could be obtained from an issue of road bonds. Autostrada Po
  • Strabag to build 24km section of Poland’s S6 for €83 million
    November 2, 2015
    Publically listed Strabag has won the design and build contract to build a 24km section of Poland’s S6 for €83 million. The S6 expressway links the largest cities in northern Poland, Szczecin and Gdańsk. The publicly listed construction group Strabag will design and build the section between Goleniów and Koszalin for about €83 million. Construction of the 24 km dual carriageway asphalt road with two lanes of traffic in each direction will start this month with a scheduled finish of June 2019. The cont
  • Grupo Rubau awarded a section of Poland’s S-61 Expressway project
    February 5, 2018
    Spanish contractor Grupo Rubau has won a €120 million deal for construction of a 19.4km section of the S-61 motorway in Poland. Work on the stretch connecting Ostrow Mazowiecka and Szczuczyn will be finished in 31 months.
  • Poland tenders for more A2 work between Lodz and Warsaw
    January 8, 2019
    A tender has been announced to build a third lane for the A2 motorway between Lodz and Warsaw in Poland. According to the Polish General Directorate for National Roads and Motorways (GDDKiA), the cost will be around €139 million with completion set for 2021. The A2 is part of the country’s road infrastructure connecting Poland with the European motorway network. The A2 Motorway is part of the TransEuropean Road Network (E30) from Cork in Ireland to Omsk in Russia and is located in Pan-European transport