Skip to main content

Poland: GDDKiA sets winter road maintenance budget

Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
October 22, 2014 Read time: 2 mins
Poland’s General Directorate for National Roads and Motorways (1361 GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15.

Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads.

Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish capital Warsaw. Building the 18.5km that comprises the three sections is expected to cost nearly $2.03 billion (€1.6 billion).

Also planned is construction of three sections of the S6 express road totalling just over 54km from Goleniow near Szczecin to Koszalin. GDDKiA expects that each section will take up to 37 months to complete. The entire project will cost an estimated $909 million (€718.4 million).

Other planned works are for the $216.5 million (€171 million) Rzeszow to Jaroslaw section of the A4 highway and the $130.4 million (€103 million) S8 dual carriageway between Warsaw and Bialystok.

For more information on companies in this article

Related Content

  • Poland's complex road dispute
    March 1, 2012
    The complex legal case between the Polish General Directorate for National Roads and Motorways (GDDKiA) and Austrian contractor Alpine Bau is continuing in the Polish courts.
  • Russia: MISK wins tender for Yuzhnaya Rokada construction in Moscow
    September 22, 2015
    MISK wins tender for Moscow’s Yuzhnaya Rokada road The Moscow Engineering and Construction Company (MISK) has won the tender for construction of the second section of Moscow’s Southern lateral highway. MISK was the only contractors tendering for the contract, worth nearly US$74.3 million, for the section called Yuzhnaya Rokada. Details include construction of 5km of road, essential side lanes, more than 300m of overpasses and turnoffs. Work is expected to take nearly 20 months. The tender win co
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan
  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no