Skip to main content

Poland: Budimex picks up S3 express road work near Lubin

The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
December 18, 2014 Read time: 2 mins
The Polish construction consortium of 3302 Budimex and 2717 Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw.

The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial.

In early December, Budimex announced it was to build a ring road around the medieval town of Gniezno, about 50km from Poznan, in west-central Poland.

The Gniezno work includes construction of an 18km section of the express road and three interchanges, four bridges and five flyovers along the S5 road, as well as nine flyovers, including one passage for animals.

Construction is to take 22 months, meaning a start by March 2015.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18950 0 oLinkExternal reported in September Visit polish projects provide transport plan Page false /sections/general/news/polish-projects-provide-transport-plan/ false false%> that the government is planning seven transport projects as part of the Connecting Europe Programme.

For more information on companies in this article

Related Content

  • Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc
    July 11, 2017
    The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.
  • Caterpillar loads up a golf course and takes it for a spin
    July 13, 2015
    Caterpillar’s recent advertising campaign lends new meaning to the term ‘driving range’. The construction equipment manufacturer loaded several heavy mining and dump trucks with soil and created a moving golf course, complete with greens and even a small waterfall. The company then had two golfers attempt to hit the “greens” as the trucks, including a 928 wheel load, drove around within driving distance of the professionals. Click here to see not just how well the golfers did underneath a clear blu
  • Oregon’s electric vehicles cruise the West Coast Electric Highway
    December 3, 2014
    Many US states offer cash-back deals and tax breaks to encourage people to buy more electric vehicles. But Oregon has shunned financial incentives and opted to drive up EV sales through increasing the number of recharging stations.
  • ADB loan for Armenia-Georgia highway
    November 4, 2016
    Approval for a US$50 million loan to develop a highway stretch in Armenia has been given by the Asian Development Bank (ADB). The loan will be used to upgrade the M6 Highway from Vanadzor in Armenia to the country’s border with Georgia at Bagratashen. The route is one of the most strategic roads for internal and external trade for landlocked Armenia while it also lies close to the country’s border with Azerbaijan. The upgrading of this highway will also provide an important link to the Black Sea Ring Road p