Skip to main content

Poland: Budimex picks up S3 express road work near Lubin

The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
December 18, 2014 Read time: 2 mins
The Polish construction consortium of 3302 Budimex and 2717 Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw.

The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial.

In early December, Budimex announced it was to build a ring road around the medieval town of Gniezno, about 50km from Poznan, in west-central Poland.

The Gniezno work includes construction of an 18km section of the express road and three interchanges, four bridges and five flyovers along the S5 road, as well as nine flyovers, including one passage for animals.

Construction is to take 22 months, meaning a start by March 2015.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18950 0 oLinkExternal reported in September Visit polish projects provide transport plan Page false /sections/general/news/polish-projects-provide-transport-plan/ false false%> that the government is planning seven transport projects as part of the Connecting Europe Programme.

For more information on companies in this article

Related Content

  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Hi-viz hijinks make a flockery of saftey clothing
    September 16, 2015
    Fashionable they aren’t, but the wearing of high-visibility clothing is increasingly either recommended by businesses or made mandatory by law, especially for construction workers on every kind of site. But has the use of “hi-vis” clothing, especially the vest, gone too far? In Britain, the wearing of the hi-viz clothing has taken off - literally, according to a BBC television news report that shows a flock of chickens wearing the fluorescent coloured vest.