PERI’s VARIOKIT as cantilever equipment takes to bauma stage

PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
February 13, 2013 Read time: 3 mins
PERI’s successful VARIOKIT formwork as cantilever equipment will be showcased at bauma
298 PERI’s VARIOKIT engineering construction kit, being showcased at 688 Bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years.

From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable.

Now it can also be used for the balanced cantilever method with a few additional, newly developed system components.

The new components for the longitudinal direction of the cantilever equipment facilitate concreting of segments up to 5.75m in length, said to be state-of-the-art in terms of current methods. Existing system components of the engineering construction kit are used in the lateral direction, while PERI claims to have achieved maximum adaptability for different bridge cross-sections, resulting in cantilever equipment with high flexibility for shaping the bridge cross-section, with the added benefit of being simple to use.

PERI says the re-positioning process for the next stage of concreting has been made extremely user-friendly, due to a new kind of mechanism said to require little extra manual work. All system parts with the exception of anchoring equipment are available to rent from PERI, said to make cantilever construction very cost-effective. Moreover, all components can be used on further projects with no additional work – a claimed major advantage even for different kinds of engineering works. The supply of carriages and formwork from one place is among other claimed advantages of using PERI’s VARIOKIT as cantilever equipment.

PERI developers are said to have ensured VARIOKIT engineering construction kit is easily compatible with other PERI systems, which means customers can use the PERI UP modular scaffolding for safe working platforms and access ways to all working levels. According to PERI, a site team in 2012 was able to achieve a four to five day cycle per concreting stage using the new cantilever equipment during construction of a motorway bridge in Poland.

Visitors to PERI’s bauma exhibition will also be able to see other new solutions for construction on cantilevered parapets. This includes a new cantilevered parapet bracket with lightweight individual parts and improved adaptability to the parapet geometry. There are also said to be system improvements for the cantilevered parapet carriage, which has many advantages for longer bridge structures.

Stand: FGN.N719

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.PERI.com www.PERI.com false http://www.peri.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • myPERI online portal presented in detail for first time during bauma
    February 13, 2013
    myPERI online portal will be presented in detail at a major construction equipment industry trade show for the first time during bauma. It gives customers of the internationally-renowned German formwork solution company round-the-clock access to extensive technical information and specific project data for their PERI construction sites. Project-specific reports, which offer, principally, a detailed overview of material stocks and flows, are said to be particularly advantageous for construction work.
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka chalks up sales revenue success
    January 6, 2017
    Globally renowned Austrian formwork company Doka has almost tripled its sales revenue in the last 12 years and is aiming for greater success in 2013, according to Group chairman Josef Kurzmann. Kurzmann said the firm recorded sales revenue of €853million in 2012, compared to €326million in 2000. Additionally, the percentage of non-European sales revenue accrued by Doka had increased from 6% in 2000 to 42% in 2012. To achieve further sales revenue growth, Kurzmann said Latin America, North America and India