Skip to main content

Penang’s PAN 1 project to go ahead amid environmental concerns

Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
April 17, 2019 Read time: 2 mins
Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study.


Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily.

The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km.

Penang Island, around 300km², is the main island of the state of Penang, located at the Malacca Strait, off the northwestern coast of Peninsular Malaysia. The island is home to nearly half of Penang state's population, including the city of George Town with a population of more than 710,000. The historical centre of George Town has been a 1384 UNESCO World Heritage Site since 2008.

The project will consist of a six-lane highway to alleviate congestion on local roads across the island, including the Tun Dr Lim Chong Eu Expressway and surrounding arterial roads.
 
The Department of Environment approved PAN 1 but with 56 conditions attached, according to Chow Kon Yeow, chief minister of Penang state and who made the announcement.

However, some environmental groups expressed concern over the highway’s impact on the countryside, including any dangers to heritage sites.

For more information on companies in this article

Related Content

  • UK’s controversial Stonehenge Bypass tunnel to go ahead
    February 21, 2024
    The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
  • Costs rise for extending the South Luzon Expressway around Manila
    May 10, 2016
    South Luzon Tollways Corporation has said the cost of extending the South Luzon Expressway (SLEx) in the Philippines has increased by 27% from nearly US$290 million to almost $348. The SLEx already runs for 36km around the greater Manila area. South Luzon Tollways is preparing the detailed engineering for the 58km SLEx Toll Road Project Number Four - the last of the four expressway sections. South Luzon also will select a construction contractor for the project, split into five works contracts and sch
  • Moscow to turn from implementation of Fourth Ring Road project
    January 5, 2016
    The Moscow City Government plans to complete building of the North-East and North-West Chords, two of the biggest road building projects in the city for the last 15 years The links will be completed during the next several months, according to an official spokesman of the Moscow Government. Both roads are considered as a cheaper alternative to the Fourth Ring Road, the construction of which was considered by the Moscow Government several years ago. However due to huge costs, which are estimated at mo
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.