Skip to main content

Penang’s PAN 1 project to go ahead amid environmental concerns

Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study. Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily. The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km. Penang Island, around 300km², is the main islan
April 17, 2019 Read time: 2 mins
Malaysia’s Penang state has approved the PAN 1 Highway project but with conditions attached following an environmental impact study.


Work could start next year on the 19.5km project – officially called the Pan Island Link 1 - that will likely cost around US$1.7 billion, according to a report in the newspaper Sundaily.

The project will consist of 7.6km of viaducts, four tunnel sections totalling 10.1km in length and embankment sections totalling 1.8km.

Penang Island, around 300km², is the main island of the state of Penang, located at the Malacca Strait, off the northwestern coast of Peninsular Malaysia. The island is home to nearly half of Penang state's population, including the city of George Town with a population of more than 710,000. The historical centre of George Town has been a 1384 UNESCO World Heritage Site since 2008.

The project will consist of a six-lane highway to alleviate congestion on local roads across the island, including the Tun Dr Lim Chong Eu Expressway and surrounding arterial roads.
 
The Department of Environment approved PAN 1 but with 56 conditions attached, according to Chow Kon Yeow, chief minister of Penang state and who made the announcement.

However, some environmental groups expressed concern over the highway’s impact on the countryside, including any dangers to heritage sites.

For more information on companies in this article

Related Content

  • Czech watchdog Hlidac Statu criticises slow motorway construction
    January 21, 2019
    Hlidac Statu, the Czech government spending watchdog, criticised the slow pace of motorway construction, saying it lags behind other EU states in the eastern region. But Czech prime minister Andrej Babis hit back, saying that his government has overseen an unprecedented level of motorway construction and investment. Radio Praha reported that Michal Bláha, founder of the watchdog, said data from Eurostat shows that only 300km of new motorway has been built in the Czech republic since 2000. Eurostat, ba
  • Opus lands Sarawark’s Coastal Road and Second Trunk Roads project
    April 23, 2019
    Malaysia’s Sarawak state government has appointed Opus Consultants, part of UEM Edgenta, as management consultant for the Coastal Road Network and Second Trunk Roads project. The US$2.65 billion project's first work package was awarded to Opus Consultants. The firm will be working alongside Sarawak Public Works Department in offering overall technical expertise and project management. Opus will conclude preliminary and detailed designs of 20 work packages, which range from the building of new bridges
  • Mexico’s new highway for Oaxaca
    May 3, 2023
    Mexico’s Oaxaca State is to benefit from a major new highway link – Mauro Nogarin and Mike Woof report
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.