Skip to main content

Parsons wins design services contract for Chicago’s Webster Street Bridge

Parsons Brinckerhoff has won a contract from the Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge. The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, Illinois Environmental Protection Agency, Illinois Department of Natural Resources, and the US Coast Guard. Parsons will offer engineeri
December 11, 2012 Read time: 1 min
2693 Parsons Brinckerhoff has won a contract from the 7008 Chicago Department of Transportation (DOT) in the US to provide final and preliminary design services for the rehabilitation of Chicago’s Webster Street Bridge.

The firm will also be in charge of coordination and community outreach with adjacent property owners, and coordination with the US Army Corps of Engineers, 7005 Illinois Environmental Protection Agency, 7006 Illinois Department of Natural Resources, and the 7007 US Coast Guard. Parsons Brinckerhoff will offer engineering services to do the work associated with the approval and preparation of all preliminary engineering documents. Once the preliminary engineering reaches completion, Parsons Brinckerhoff will do phase-two design engineering, prepare construction contract documents, including specifications and estimates, final plans and review of construction shop drawings.

Rehabilitation works will begin in 2015, with construction due to reach completion the following year.

Related Content

  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Finley’s triple bridge design-build success in Israel
    April 9, 2013
    Finley Engineering Group (Finley) is providing segmental bridge design and construction engineering services on three design-build projects in Israel. Road 722 is a US$68.9 million project in Haifa awarded to Danya-Cebus. The project’s twin precast segmental bridges have a total length of 314m and six spans. The Road 722 Bridge is said to be based on the same cross section and erection method that Finley developed for Danya-Cebus and used on the Road 431 project (5 bridges), the Section 18 Interchange (6 br
  • Rubber tyred rollers see key developments
    June 23, 2015
    A series of new rubber tyred asphalt compactors are now coming to market from several key manufacturers - Mike Woof writes Several of the major European compactor manufacturers are introducing new rubber tyred machines to meet demand. Pneumatic tyred rollers are often used for finishing work in road construction, due to the high quality surface they can deliver.
  • Spanish firms interested in US$740mn Chile bridge project
    June 5, 2013
    Spanish companies Sacyr, ACS and OHL will take part in three of the consortia that will bid in the US$740 million contract to build the longest suspension bridge in Chile. Works for the 2.5km Chacao Bridge, connecting the island of Chiloe and Chile's coast line, are expected to be awarded during the first quarter of 2014, with construction due to begin in 2015.